C-FIT can be hoisted, stacked, and used as a stadium screen to meet a variety of usage scenarios. The whole product adopts magnesium alloy die-casting molding process to make it tough and stable, and avoid hidden dangers in transportation. It can be seamlessly spliced after being processed by CNC. The quick locking mechanism makes it possible to complete the installation of a box in 10 seconds. The screen waterproof level reaches lP65. The innovation of the product is to enhance the user's operating experience, while saving transportation, installation and maintenance costs, and reducing the construction time.
小小心意,大大鼓励
本作品版权归 Cade Jie 所有,禁止匿名转载及个人使用,任何商业用途均需联系原作者。
举报21赞 6评论 2323人气
11赞 7评论 5205人气
19赞 5评论 2930人气
11赞 10评论 2983人气
确认要删除该条评论吗?
小小心意,大大鼓励
最高赞赏200元
使用支付宝扫描二维码完成支付
使用微信扫描二维码完成支付
当前余额:¥0.00
支付操作会向你普象账户的注册手机号发送验证码
请注意查收
扫一扫添加
普象商务
扫一扫添加
客服微信
扫一扫下载
手机APP
整体感觉挺精致的 渲染建模都有点厉害哦
很不错~
高手,鉴定完毕